Skip to main content
Real Projects & Proven Experience (Case Studies)

Our Projects in Detail

We don't settle for generic stock photos. As professional subcontractors, we document the logistical, structural, and compliance challenges we face and how we resolve them on time and within budget.

Installed solid HDPE toilet partitions and vandal-proof anti-fog mirrors at Matter Academy School restroomsHigh-durability solid HDPE toilet partition stalls showing custom masonry wall offsetsHeavy-duty stainless steel restroom accessories and secure hand dryer installationUrinal privacy panels with secure continuous stainless steel bracketsOverview of 22 fully renovated, ADA-compliant restroom stalls at Matter Academy School
Education / K-12 High-Traffic Facility

Matter Academy School Restroom Renovation

Miami, FL

Stalls Installed22 Units
Accessories115 Units
On-site Duration6 Days
Contracted Scope

Furnish & Install (F&I) of Toilet Partitions, Urinal Privacy Panels, Mirrors & Restroom Accessories


Critical Challenge

Upgrading high-traffic student restrooms under a strict pre-semester schedule. Required extreme material durability against vandalism/wear while resolving existing wall plumb irregularities and uneven masonry partition anchors.

Solution & Execution

Engineered a heavy-duty partition setup using Scranton Solid HDPE panels with continuous stainless steel brackets. Conducted laser-guided leveling maps to customize spacer offsets along uneven masonry walls, securing anti-fog safety mirrors with multi-point vandal-proof fasteners.

Result & Impact

Fully renovated 5 separate restroom complexes (22 stalls total) in just 6 working days. Delivered outstanding impact and graffiti resistance, passing district code and ADA inspections on the first walkthrough.

Key Deployed Components:Scranton Products 1" Solid HDPE Toilet PartitionsIPC Vandal-Resistant Urinal Privacy PanelsBobrick Recessed Anti-Fog Safety Glass MirrorsBradley Heavy-Duty Stainless Steel Restroom Accessories
High-impact vinyl crash rails and handrails in Sarasota Cancer Center clinic hallwayClass A fire-rated wall protection sheets with dual-laser alignment in patient corridorHeavy-duty corner guards installed on clinical drywall partitionsADA-compliant ergonomic handrails with secure wall brackets in oncology wingSarasota Cancer Center corridor with high-impact wall protection and corner guardsLaser-leveled heavy-duty handrail installation along hospital corridorClass A fire-rated wall protection sheets in clinical treatment areaSatin-finish heavy-duty wall protection crash railsClose-up of ADA ergonomic brackets and handrail end-caps on hospital wallsPatient care hallway showing seamless installation of vinyl corner guardsHigh-traffic patient corridor with impact-resistant wall panelsPolished medical corridor with crash rails and corner protectionDetailed view of wall protection panels showing zero-deficiency seamsSeamless oncology unit hallway wall protectionWaiting area featuring clean-finish vinyl crash railsFinished hospital hallway with fully ADA-compliant wall handrails
Healthcare / Oncology & Patient Care

Sarasota Cancer Center

Sarasota, FL

Wall Protection1,200+ Lin. Ft.
Corner Guards84 Units
ADA Compliance100% Passed
Contracted Scope

Furnish & Install (F&I) of Crash Rails, Handrails, Wall Protection & Corner Guards


Critical Challenge

Executing high-impact architectural protection in active healthcare environments. Required strict compliance with dust containment (HEPA filtration), zero-noise thresholds during oncology therapy hours, and precise horizontal leveling across pre-existing non-standard drywall partitions.

Solution & Execution

Deployed specialized night shifts (7:00 PM to 4:00 AM) using isolated negative-pressure dust tents. Utilized dual-laser alignment systems to mount heavy-duty vinyl handrails and crash rails, ensuring microscopic leveling precision (<1 mm variance) across long-span corridors.

Result & Impact

Perfect installation of over 1,200 linear feet of wall protection and 84 corner guards with zero patient disruptions. Passed final clinical safety and ADA inspections on the first walkthrough with absolute zero deficiencies.

Key Deployed Components:IPC/Inpro High-Impact Vinyl Crash Rails & HandrailsAcrovyn Class A Fire-Rated Wall Protection SheetsHeavy-Duty Stainless Steel Core Corner GuardsADA-Compliant Ergonomic Brackets & Handrail End-Caps